Projects · Site record, Lima
Real work, documented
Everything on this page was filmed on site by our own crew. No renders and no stock library: this is what our work looks like while it is happening. It is also the same record you receive on WhatsApp while your own job is running.
Featured project
The DaVinci room at Hospital Dos de Mayo, in Lima. Our crew during the installation of a curved wall panel.
- Room
- DaVinci room
- Venue
- Hospital Dos de Mayo, Lima
- Work
- Curved wall panel installation
- Crew
- Three ADN technicians, in uniform
- Record
- Photographed mid-installation
This record is part of the documentation we keep on every job. Ask us on WhatsApp for more material from this or any other project. If you do not speak Spanish, we put an English speaker on your job and you get the same record in English.
The video record
Twelve clips filmed on site, straight off our crew's phones. Each one names the type of work and its length.
Want to see more?
We post a record of our jobs on TikTok, and we share more references directly on WhatsApp.
How we document every job
The same standard of record on every project, from day one to handover. If you are not in Peru, this is how you see your property.
-
Before, during and after
We photograph and film the starting condition, the progress and the finished result of every job.
-
Updates on WhatsApp
While your job runs, photos and video of the progress land straight on your phone. Nothing to translate.
-
Handover record
We close with a final walkthrough and a signed handover record, with the warranty in writing.
- +51 980 456 504
- TikTok
- @adnconstruccion
- Location
- Miraflores, Lima, Peru
We reply on WhatsApp during office hours, Monday to Saturday. Write in English, we answer in English. If you take the job on, we put an English speaker on it.